fast

SPS Terraces save construction time, simplify projects and allow earlier opening.

SPS Terraces can shorten construction programmes by 15%, because 3-4 times more SPS Terraces can be lifted per hoist, than precast concrete units. With crane time on a project’s critical path, fewer terrace lifts allow other elements of the build to be significantly accelerated.

SPS Terraces are quick and easy to erect: all structural connections use standard steel detailing. Fixture points for seats and other attachments can be pre-drilled in the factory. Joints can be made watertight simply and effectively, reducing the need for additional under-stand protection. Furthermore, in even in confined spaces with restricted crane access SPS Terraces can even be lifted into place using a tele-handler.

Using SPS Terraces makes it easier to meet demanding stadium project schedules. Reducing the programme offers owners earlier opening for new venues and the opportunity to complete extension projects within ever shortening off-seasons.

fast
SPS - The Sandwich Plate System

Intelligent Engineering (IE) Company Profile
Find out more about Intelligent Engineering and the different SPS applications

Transocean Legend
Click here to find out about this aluminimum helideck that was upgraded using SPS Overlay